Tuesday, August 16, 2011

installation

installation of the artwork occured over two days.  day-one, we finalized assembly of the artwork and placed the support brackets and conduit.  the brackets are secured with epoxy screen bolts that needed to dry over night.


grant (von/eckman) tapes out the placement of artwork on the building exterior.




brackets in place with conduit running down the center of the artwork.




on day-two, we placed the artwork and hooked up the LEDs to the solar-powered conduit.  some strips were tagged for removal prior to installation so that we could reach the brackets and electrical connection points.




grant, ben, and mikel from von/eckman completed the installation. 