installation of the artwork occured over two days. day-one, we finalized assembly of the artwork and placed the support brackets and conduit. the brackets are secured with epoxy screen bolts that needed to dry over night.
grant (von/eckman) tapes out the placement of artwork on the building exterior.
brackets in place with conduit running down the center of the artwork.
on day-two, we placed the artwork and hooked up the LEDs to the solar-powered conduit. some strips were tagged for removal prior to installation so that we could reach the brackets and electrical connection points.
grant, ben, and mikel from von/eckman completed the installation.